The VGS, VGZ and RTR full-thread connectors are now certified for any type of application where a timber element (wall, ceiling, etc.) must transmit stresses to a concrete element (bracing core, foundation, etc.). The concrete prefabrication combines with timber prefabrication: the reinforcing bars inserted into the concrete casting accommodate the full thread timber connectors; the supplementary casting carried out after installing the timber components completes the connection. Learn More
SAFETY LEARNING: VIDEO SERIES ON THE INSTALLATION OF FALL ARREST SYSTEMS.
Ready to be safe? Subscribe to this Video Series and receive the link to the videos. This Video Series from Rothoblaas details basic information regarding the installation, annual inspection and documentation procedures of fall arrest systems produced by Rothoblaas. Topics covered in this Video Series include: the risks related to falls from height and the relevant standards of reference; solutions for attaching the fall arrest systems on various surfaces; and, assembly…
Envelope Solutions for Passive House Designs
Jason Cattelino (Technical Consultant) and Jim Muhaw (Area Manager-Northeast) with Rothoblaas USA will present envelope solutions that will provide strategies for air tightness and waterproofing in passive house designs for low-energy, healthy, comfortable, and durable buildings. Learning outcomes: Brief overview of the goals of Passive House Design Interior Air Tightness Strategies: Offer the differences between Vapor Stops, Vapor Barriers and Vapor Control Membranes. Exterior Weather Resistant Barriers: Offer the differences…